Saint-Pierre and Miquelon ferry terminalComplete project management for the terminal and all equipment

Lieu : Saint Pierre and Miquelon

Client : SPL Archipel Aménagement

Date : 2017 - 2019

Le projet

SPL Aménagement has been appointed by the Collectivité Territoriale de Saint Pierre et Miquelon to manage the project to create a ferry terminal linking Saint Pierre to Miquelon and Canada (Port de Fortune).

This link is essential for economic reasons (tourism and trade).

Given that the ships are due to arrive at the end of 2017, the challenge for the project is to ensure rapid completion, and to consider a provisional phase for accommodating the ships, which must be integrated into the final structure.

The structure to be built must allow two ferries to dock and operate simultaneously.

In addition to the berthing and mooring structures, the project also includes the construction of the landfill, roadways, parking lots and associated networks (external works and equipment).

Nos missions

The mission entrusted to setec international includes :

  • project design
  • Diagnosis of existing structures to which the new terminal will be connected
  • geotechnical engineering
  • design of equipment, networks and sizing of structures
  • contract awarding and works supervision
  • the terminal includes :

– berthing facilities for two 56m ferries (width 11 m)

– an enclosing dike and an open area for traffic operations and parking

– all networks (AEP/EP/EU/Lighting/Elec)

– all equipment required for operation

Nos expertises mobilisées

Découvrir d'autres réalisations

Women’s Rights Day


March 2024

setec international celebrates international women’s rights day and is proud to announce ...

Women’s Rights Day


March 2023

setec inter celebrates International Women’s Rights Day, and is proud of its Gender ...

Valenciennes northern bypass


March 2023

On Monday 06 March 2023, the first section of the Valenciennes Northern Bypass project, for ...