Rehabilitation & Modernization of the Transgabonaise Libreville-Franceville roadAssistance to the project owner, Preliminary design & CAD
Client : Société Autoroutière du Gabon
Le projet
SAG – Société Autoroutière du Gabon (Olam Arise & Meridiam) has signed a public-private partnership (PPP) in 2019 with the government of the Gabonese Republic for the 30-year concession of the link between Libreville and Franceville, known as the “Transgabonaise”.
Setec was commissioned to draw up a Detailed Project Report and design-build tender documents for the rehabilitation and upgrading of 828km of road, according to the following phasing:
- Phase1:
- 80 km of two-lane national road from kilometre points 24+500 to 105+000 on Route Nationale 1 ( RN1) and,
- 50km of national road along Route Nationale 3 from the village of Mikouyi (junction of Route Nationale 6 with RN3) towards Libreville.
- including traffic and revenue studies on the Transgabonaise between Libreville and Franceville.
- Phase 2: 337 km on RN3/RN2 between Alembé and Mikouyi (50 km point phase 1)
- Phase 3:
- PK0 to PK24 on the Libreville road
- 135Km from PK105 (RN1) to Alembé (RN3)
- 192Km on the RN3 between Mikouyi and Franceville
- 10 Toll plazas (total design)
93km de route réhabilitées selon les normes internationales
1 filiale sur place qui accompagne le projet localement : setec infra gabon
1.260 riverains accompagnés quotidiennement
Nos missions
- Management and execution of field campaigns: topography, geotechnics, hydraulics, traffic and weighing,
- Preliminary design of the development including the following components:
- Rehabilitation of roadway and platform
- Rehabilitation of hydraulic structures and longitudinal drainage,
- Signage and safety equipment
- Barriers and toll systems
- Maintenance and operation center
- Longitudinal improvements in residential areas (parking lots, sidewalks, etc.),
- Cross-functional assistance missions:
- Diagnosis of existing engineering structures
- Toll weighing study
- Traffic and revenue studies
- Management of economic and financial studies
- Maintenance and operation strategy
- Participation in ministerial decision-making bodies
- Preparation of design-build contracts (FIDIC SILVER BOOK)
- Tender analysis and negotiations
- Follow-up assistance
Nos expertises mobilisées
Découvrir d'autres réalisations
February 2003
The rapid deterioration in traffic conditions on the Cape Verde peninsula (Dakar region) in ...
January 2010
Since January 2010, the Setec Group, together with Bernard Reichen Architecte Urbaniste and ...
LGV Bretagne Pays de la Loire
April 2011
The Bretagne – Pays de la Loire High-Speed Line (LGV) project is an extension of the LGV ...