Highway M11 – Moscow / St. PetersburgGeneral design and detailed design studies
Client : North West Concession Company
Le projet
The Moscow-St. Petersburg freeway is the first in the Russian Federation to have sections under concession.
Section 1, 43 km long, is connected at its origin to the Moscow Outer Ring Road (MKAD). In particular, it serves the national and international terminals of Sheremetyevo airport and the town of Zelenograd.
The main highlights of the project are
- the need to ensure the economic equilibrium of the concession,
- the complexity of some of the seven interchanges,
- major viaducts, – its urban character at the origin of the project,
- the implementation of a toll system and operating systems that ensure a high level of safety and service.
Construction work was carried out between 2010 and 2015.
Nos missions
- critical analysis of the “project” file drawn up by the administration, – design optimization proposals and presentation of these optimizations to the administration (Preliminary Optimised Design Documentation: PODD),
- preparation of technical appendices to the concession contract,
- Optimised Design Documentation (ODD),
- preparation of a detailed design brief,
- participation in Project Management for the preparation and execution of work.
The technical areas covered were as follows:
- functionality and geometry,
- earthworks, pavements, drainage and water treatment,
- engineering structures,
- toll equipment and specialized equipment,
- safety equipment and signage,
- buildings,
- landscape,
- acoustic.
Nos expertises mobilisées
Découvrir d'autres réalisations
March 2024
setec international celebrates international women’s rights day and is proud to announce ...
March 2023
setec inter celebrates International Women’s Rights Day, and is proud of its Gender ...
Valenciennes northern bypass
March 2023
On Monday 06 March 2023, the first section of the Valenciennes Northern Bypass project, for ...